Ready for the kitwalls, floor, drainage and services in before the tanks
Case study · Brewery
Brewery fit‑out, from an empty unit
An empty unit turned into a hygienic, wash-down brewhouse, built ready for the brewing kit to go in.
Federation of Master BuildersVetted member no. 170092
- TrustMark registered
- CHAS / SafeContractor accredited
- Constructionline registered
- £5m public liability insurance
The job
A brewery has to be easy to clean every day, drain properly and stand up to water, heat and heavy equipment. We took an empty unit and built the whole room for that: walls, ceiling, floor, drainage and services, managed by one contractor.
- Hygienic wall and ceiling panels throughout, with a black coved skirting sealed to the floor
- Non-slip resin floor draining to a stainless slot channel the length of the room
- Cable tray, stainless service runs, LED lighting and power to the control panels
- Wash-down hose reel, plus a separate cold store with its own air conditioning
01 · The room
Panelled, floored and drained first
The walls, ceiling, floor and drain went in before any equipment arrived, so the room was ready for the kit to be installed.
- Hygienic wall and ceiling panels
- Black coved skirting sealed to the floor
- Stainless slot channel the length of the room
02 · Services
Power, pipework and wash-down
Cable tray, stainless service runs and LED lighting run overhead, with power taken to the control panels and a hose reel for washing down.
- Cable tray and stainless service runs
- LED lighting
- Power to the control panels
- Wash-down hose reel
03 · The kit in
Tanks either side of the drain
With the room finished, the brewing kit went in. Every tank stands either side of the drain channel.
- Tanks either side of a stainless drain channel
- Vessels, pumps and heat exchanger on the resin floor
- Services run overhead
04 · Cold store
A cold store with its own air conditioning
The job also includes a separate cold store, with a sealed floor, painted brick and its own air conditioning.
- Sealed floor and painted brick
- Its own air conditioning
- Two wall-mounted units joined by insulated pipework
Planning one like this
The floor and drainage go in before your equipment, so tank, bench and drain positions need settling early. We'll go through the layout with you at the site visit.
More work
Other projects and services
Catering kitchen fit-out
The kitchen at The Red Lion, shown stage by stage from lined walls to the cooking line.
See the projectThe Red Lion, Bloxham
A working village pub taken from roof structure to finished floor.
See the projectBrewery & food fit-outs
Rooms built to wash down and drain, for food and drink businesses.
Brewery & food fit-outsCommercial fit-outs
Pubs, breweries, restaurants, offices, retail and industrial units.
Commercial fit-outs4.8 out of 5 on Google 20 reviews. Photos and directions to Peter & S Building Services Ltd.
Free site visit
Planning a brewery or kitchen fit-out?
A site visit costs nothing and you get a fixed, written price afterwards.