Brewery tank hall with stainless tanks either side of the drain and services running overhead

Ready for the kitwalls, floor, drainage and services in before the tanks

Case study · Brewery

Brewery fit‑out, from an empty unit

An empty unit turned into a hygienic, wash-down brewhouse, built ready for the brewing kit to go in.

Federation of Master Builders member logoFederation of Master BuildersVetted member no. 170092
  • TrustMark registered
  • CHAS / SafeContractor accredited
  • Constructionline registered
  • £5m public liability insurance

The job

A brewery has to be easy to clean every day, drain properly and stand up to water, heat and heavy equipment. We took an empty unit and built the whole room for that: walls, ceiling, floor, drainage and services, managed by one contractor.

  • Hygienic wall and ceiling panels throughout, with a black coved skirting sealed to the floor
  • Non-slip resin floor draining to a stainless slot channel the length of the room
  • Cable tray, stainless service runs, LED lighting and power to the control panels
  • Wash-down hose reel, plus a separate cold store with its own air conditioning

01 · The room

Panelled, floored and drained first

The walls, ceiling, floor and drain went in before any equipment arrived, so the room was ready for the kit to be installed.

  • Hygienic wall and ceiling panels
  • Black coved skirting sealed to the floor
  • Stainless slot channel the length of the room

02 · Services

Power, pipework and wash-down

Cable tray, stainless service runs and LED lighting run overhead, with power taken to the control panels and a hose reel for washing down.

  • Cable tray and stainless service runs
  • LED lighting
  • Power to the control panels
  • Wash-down hose reel

03 · The kit in

Tanks either side of the drain

With the room finished, the brewing kit went in. Every tank stands either side of the drain channel.

  • Tanks either side of a stainless drain channel
  • Vessels, pumps and heat exchanger on the resin floor
  • Services run overhead

04 · Cold store

A cold store with its own air conditioning

The job also includes a separate cold store, with a sealed floor, painted brick and its own air conditioning.

  • Sealed floor and painted brick
  • Its own air conditioning
  • Two wall-mounted units joined by insulated pipework

Air conditioning

Planning one like this

The floor and drainage go in before your equipment, so tank, bench and drain positions need settling early. We'll go through the layout with you at the site visit.

See brewery & food fit-outs

More work

Other projects and services

See all projects

Catering kitchen fit-out

The kitchen at The Red Lion, shown stage by stage from lined walls to the cooking line.

See the project

The Red Lion, Bloxham

A working village pub taken from roof structure to finished floor.

See the project

Brewery & food fit-outs

Rooms built to wash down and drain, for food and drink businesses.

Brewery & food fit-outs

Commercial fit-outs

Pubs, breweries, restaurants, offices, retail and industrial units.

Commercial fit-outs

4.8 out of 5 on Google 20 reviews. Photos and directions to Peter & S Building Services Ltd.

Free site visit

Planning a brewery or kitchen fit-out?

A site visit costs nothing and you get a fixed, written price afterwards.

WhatsApp us